Monday, October 17, 2011

October 17, 2011

 Concrete is being pumped onto the floors of Building B. In the foreground you can see the elevator pit in Building C which was recently excavated and now filled with this weekends rain
 Office counter tops are being delivered
 The ceiling in the Commons is finished
 Floor exposed in the labs
 Offices are being prepared for carpet installation
Second floor concrete pad in Building B

October 11, 2011

 A photo by Dick Rollins who took this shot from across the Damariscotta River
 The Ceiling in the commons of Building A




October 10, 2011

 Exterior panels on Building B are all in place
 Building C (Center for Ocean Heath) foundation outline is being drawn out on the ground

 Offices are coming along
 Finishing touches on the lab casework
View from the parking lot

October 04, 2011

 Wall panels for Building B have arrived and are being attached

 Interior lab casework continues to be installed into Building A

 Stainless Steel counter has been delivered and placed into the Autoclave Room
Panels go up pretty quick

September 27, 2011

 Building B

 Commons ceiling in Building A



 Communications room in Building A
 The dock seal which will marry the mobile lab to the building

Friday, October 7, 2011

September 22, 2011

 Steel decking of Building B is progressing though slightly delayed due to weather today
 

 The finished South side of Building A

 Loading dock now has doors and a leveler
 Our communication room with 100 million miles of data cable
 Offices now have glass walls

September 20, 2011

 Blasters are back on site clearing ledge that is problematic for the upper parking lot and access road down to the dock
 All structural steel for Building B is in place


 Interior finish work continues in Building A
 2nd floor look into the Commons
 A view into the Clean Lab
 The Loading dock slab and drain are all in place
 A view from the Water Side
 Site of the future Shore Facility and access road
 Window shades are in