Just some finishing touches and final connections remaining.
Bigelow Laboratory for Ocean Sciences
Construction of a new campus in East Boothbay, Maine
Friday, April 27, 2012
Friday, March 2, 2012
March 02, 2012
Well Hello, I have been a wee bit neglectful to this Blog. I hope I can bring you all up to speed with this single post. Due to snow I did not go outside to get images so you will have to suffer inside shots. The road to the dock continues and we should be expecting the foundation for the shore side facility to be placed in the next week or so. The exterior of the buildings is progressing (you will have to trust me, since I have no images today).
Lets start in Building B (OBCC)
Racks for the IDF room are being installed, data lines have already been pulled
Above head utilities run down the service corridor to supply both Bldg B and C hot and chilled water
Electrical room for Bldg B
Lower level access corridor for Bldg B
Air Handling unit in Bldg B
pH neutralization system for lab wastes
1st floor office in Bldg B
1st floor corridor
Cellular Biogeochemistry lab on 1st floor
Remote Sensing Ocean Observing lab 1st floor
1st floor commons
SRS offices 2nd floor
Air Sea Interactions Lab 2nd floor
2nd floor corridor
A view from the Trace Metal Clean lab, through the Trace Metal Geochemistry Lab, Fume Hood Alcove, and out the East window of the Air-Sea Interaction Lab
2nd floor commons
Now quick sneak peak into Building C (COH)
Above is a view of the 2nd floor
A view into the basement where we will house our Mesocosm, Algae grow-out facilities
Wednesday, January 18, 2012
January 18, 2012
Today's images are brought to you by NIST, who are happy to show off the exterior of Building C...Enjoy!
January 17, 2012
Today we are going inside Building B. Above is the electrical room
Basement Corridor
Air Handling Room (Pre Air Handler, which should be arriving early next week)
Stock Room
Corridor on the 1st floor
Cellular Biogeochemistry Lab
2nd Floor. Notice the windows!
And today's glimpse of Building C is the basement. Today we are pouring heat in here to thaw out the frost, so foundation work can begin
December 20, 2011
Steel has arrived for Building C (Center for Ocean Health)
Work in Building B is moving fast.
The second floor already has drywall, while the first floor is being framed.
Monday, December 26, 2011
December 06, 2011 - Moving Day #2
Now that the scientists have more room to grow in, they are quick to fill in the extra room with new equipment. Mike and Willie unpacking a new hood
December 05, 2011 - Moving Day #1
Movers staging their gear
Terry and Elin in disbelief
Brian and Ramunas watching nervously as their core equipment is moved and packed
Arrival at East Boothbay
Setting up in their new home
Weary workers taking their lunch break
Emily and Erin occupying their new office space
Mike is the first to start unpacking the boxes
View of all 3 buildings in their respective stages of development
Happy now that most of their equipment has arrived, its now the time to figure out how its all gonna fit in its new home