Well Hello, I have been a wee bit neglectful to this Blog. I hope I can bring you all up to speed with this single post. Due to snow I did not go outside to get images so you will have to suffer inside shots. The road to the dock continues and we should be expecting the foundation for the shore side facility to be placed in the next week or so. The exterior of the buildings is progressing (you will have to trust me, since I have no images today).
Lets start in Building B (OBCC)
Racks for the IDF room are being installed, data lines have already been pulled
Above head utilities run down the service corridor to supply both Bldg B and C hot and chilled water
Electrical room for Bldg B
Lower level access corridor for Bldg B
Air Handling unit in Bldg B
pH neutralization system for lab wastes
1st floor office in Bldg B
1st floor corridor
Cellular Biogeochemistry lab on 1st floor
Remote Sensing Ocean Observing lab 1st floor
1st floor commons
SRS offices 2nd floor
Air Sea Interactions Lab 2nd floor
2nd floor corridor
A view from the Trace Metal Clean lab, through the Trace Metal Geochemistry Lab, Fume Hood Alcove, and out the East window of the Air-Sea Interaction Lab
2nd floor commons
Now quick sneak peak into Building C (COH)
Above is a view of the 2nd floor
A view into the basement where we will house our Mesocosm, Algae grow-out facilities