Friday, April 29, 2011

April 26, 2011

 The entrance canopy is being prepared to receive its external skin
 Second floor windows are getting covered over in preparation for spray insulation and fireproofing
 The basement mostly ready to receive its concrete
 Insulation being set in place on the basement floor with the a vapour barrier going right on top

 Not only is this evidence that the roof drains are almost finished but also, it's just another example of how colorful this building really is
 The air handling room is ready for concrete
 This may not look like one yet, but it will soon be the stairwell into the air handling room
 Now that winter is gone, Crooker is finishing up the shoulder work along the roads
A barrier system which is the base under the rip-rap along the side of the roads

April 22, 2011

 A view of the recessed floors where the walk-in growth chambers will be installed in CCMP
 A clear day view out across the Damariscotta River from the end of the corridor on the first floor
 Looking back into CCMP from the CCMP Directors office
 Looking down the east stairwell from the first floor to the basement
 Standing in the cafe looking through the elevator down the length of the commons corridor on the first floor
Its a busy site today, activities on all levels

April 19, 2011

 The Roof, Second floor, and First floor slabs have all been poured

The membrane roofing is being installed

April 15, 2011



April 14, 2011


The platform for the dock leveler is being prepped to receive concrete
First floor is prepped and ready to receive concrete

Thursday, April 14, 2011

April 12, 2011




April 5, 2011



A view looking towards the elevator, west stairwell and front lobby
First image of the view from the CCMP area
A look back at the site cleared for the COBCC and COH buildings

April 1, 2011

Underslab utilities are in and I think Bigelow might have the happiest looking floor drain in existence. :)

March 30, 2011

To give you an idea how fast this panelling goes up, the above image was taken at 9am and the image two photos down was taken at 5pm


Wednesday, April 13, 2011

March 29, 2011

Excavation is continuing



North side panels are being installed



Underslab utilities are being put in place

March 28, 2011

Excavation is moving fast, almost feels like a raceway for dump trucks doing laps

Siding paneling is going up fast