Saturday, December 10, 2011

November 09, 2011

 First foundation walls for Building C are getting their concrete today

November 08, 2011

 Foundation walls are formed on Building C
 Fire rated glass in installed into Building A
Building B North wall supports for the zinc siding

October 28, 2011

 The Parking lot getting paved


 Concrete being poured into the footings
 A look east into Building B
 Stainless steel is up in the autoclave room
 Light fixtures in the blue stairwell
Ceilings going into the lower level

October 25, 2011

 Building C footings are being formed
 Polishing of the Building A commons floor
 A nice view of the ceiling and flooring together in the Commons
 In a race to close up Building B before the weather turns cold, the windows are being installed
Eastern wall of Building B

October 21, 2011

 Finishing touches on the terrazo flooring
Finished casework in one of our Geomicrobiology labs

October 20, 2011

 A resin base under the Terazzo flooring makes it look like we have an indoor ice-rink for a day
Offices are coming together, the desktop have been installed
 
 More lean concrete for Building C

 Building B
 Final exterior going onto the North side of Building A
Some local residents taking advantage of our recently seeded leach field

October 18, 2011

 Foundation prep for Building C
 
 Lean concrete has been poured to prep for the footings
 The commons in Building A are getting ready for the Terazzo flooring
 Wood in the ceiling of commons in Building A
Carpeting in the offices of Building A
Slabs have been poured in Building B