First foundation walls for Building C are getting their concrete today
Saturday, December 10, 2011
November 08, 2011
Foundation walls are formed on Building C
Fire rated glass in installed into Building A
Building B North wall supports for the zinc siding
October 28, 2011
The Parking lot getting paved
Concrete being poured into the footings
A look east into Building B
Stainless steel is up in the autoclave room
Light fixtures in the blue stairwell
Ceilings going into the lower level
October 25, 2011
Building C footings are being formed
Polishing of the Building A commons floor
A nice view of the ceiling and flooring together in the Commons
In a race to close up Building B before the weather turns cold, the windows are being installed
Eastern wall of Building B
October 20, 2011
A resin base under the Terazzo flooring makes it look like we have an indoor ice-rink for a day
Offices are coming together, the desktop have been installed
More lean concrete for Building C
Building B
Final exterior going onto the North side of Building A
Some local residents taking advantage of our recently seeded leach field
October 18, 2011
Foundation prep for Building C
Lean concrete has been poured to prep for the footings
The commons in Building A are getting ready for the Terazzo flooring
Wood in the ceiling of commons in Building A
Carpeting in the offices of Building A
Slabs have been poured in Building B