Foundation walls for Building B (COBCC) are complete. Backfilling and steel are next
Last of the forms will be removed shortly
Areas of the basement which will be filled in for structural support
The zinc siding is completed along the South and East sides
North and West sides still need a bit more time for zinc to be completed
The boiler room is a work in progress.
The elevator car is assembled and running
The temporary wall at the South end of the commons is up. This wall will keep the dust out of the finished Building A (BCBB) while construction on Building B continues
Ceiling grids are installed within the labs