Blasters are back on site clearing ledge that is problematic for the upper parking lot and access road down to the dock
All structural steel for Building B is in place
Interior finish work continues in Building A
2nd floor look into the Commons
A view into the Clean Lab
The Loading dock slab and drain are all in place
A view from the Water Side
Site of the future Shore Facility and access road
Window shades are in
No comments:
Post a Comment