Tuesday, August 16, 2011

August 15, 2011

 The Zinc siding on the South side of the building is completed
 Framework for the elevator doors
 Floor in the Glasswash/Autoclave room is being prepped for the epoxy flooring
 Tile flooring in the bathrooms
East wall on OBCC is being poured

August 11. 2011


 Things Inside are moving very well.  Drywall is looking good and the ceiling utilities are filling in
 Framework for the suspended ceilings
 Now that the siding installers have their system down, they are moving very quickly

 The elevator rails and platform is in, they now need to construct the car
 North side of BCBB is ready for zinc siding
 The Chiller unit is undergoing final adjustments before coming online

August 10, 2011

 Thyssenkrupp is installing the elevator
 More Zinc on the South side of BCBB
Bathrooms are being prepared for the tile
OBCC foundation walls are coming along, you can see the Air Handling opening at the back

August 04, 2011


 More Zinc!

Electric feeders are being pulled into the building

August 03, 2011

 Today we had the pleasure of showing the folks from NIST around the site.  NIST, The National Institute of Standards and Technology are funding Building C, The Center for Ocean Health.  The photo above is the group coming back from inspecting the future site  of the dock and dock-side facilities.
 The first panel of zinc siding is installed
 Above ceiling utilities continue to progress
 An extension of the Commons foundation to encompass Building B

July 28, 2011

 Concrete footings continue to be constructed on Building B (OBCC)
 


 First signs of the zinc siding are appearing on Building A (BCBB)



July 26, 2011