Tuesday, August 16, 2011

August 15, 2011

 The Zinc siding on the South side of the building is completed
 Framework for the elevator doors
 Floor in the Glasswash/Autoclave room is being prepped for the epoxy flooring
 Tile flooring in the bathrooms
East wall on OBCC is being poured

No comments:

Post a Comment