August 18, 2011

Foundation walls for Building B (COBCC) are complete.  Backfilling and steel are next
Last of the forms will be removed shortly
Areas of the basement which will be filled in for structural support


 The zinc siding is completed along the South and East sides
 North and West sides still need a bit more time for zinc to be completed

 The boiler room is a work in progress.
 The elevator car is assembled and running
 The temporary wall at the South end of the commons is up.  This wall will keep the dust out of the finished Building A (BCBB) while construction on Building B continues
Ceiling grids are installed within the labs